Publications

  1. Public Works

Development Services Building

171 N Ross St

  1. Email: webpw@auburnalabama.org
  2. Phone: (334) 501-3000
  3. Hours:  M-F: 7:30AM-4:30AM

Scott Cummings, P.E.

Public Works Director

  1. Phone: (334) 501-3001
  2. Email: scummings@auburnalabama.org

City of Auburn Public Works Design and Construction Manual – The Design and Construction Manual was completed in June 2010 with an effective date of January 1, 2011. It consolidates all design and construction standards that were previously published in the City Code, Zoning Ordinance, Subdivision Regulations, Storm Water Manual, Standard Details and Standard Specifications for street construction, traffic engineering, storm water drainage design, and geotechnical engineering.

Specification and Details – The Standard Specifications and Details are developed and maintained by the Engineering Division of the Public Works Department of the City of Auburn, Alabama.