• [Home]
    •  Contact Information
    •  About this Site
    •  Photo Credits
    •  Photo Submissions
    •  Site Tools
  • [Services]
    •  Committees and Organizations
    •  Boards and Commissions
    •  City Budget
    •  City Council
    •  City Departments
  • [Home2]
    •  Auburn City Schools (offsite)
    •  Auburn on Wikipedia (offsite)
    •  Auburn on City-Data (offsite)
    •  Auburn's Cool City Initiative
    •  Federal Benefits (offsite)
    •  Citizen Survey
    •  e-Notifier
    •  Forms & Licenses
    •  Holiday Pickup Schedule
    •  Job Vacancies
    •  Open Line
    •  Pay Water Bill (offsite)
    •  Residential Occupancy (PDF)
    •  Students
    •  Traffic Calming Request (PDF)
    •  Travel Safety (PDF)
  • [Home2]
    •  Auburn Chamber (offsite)
    •  Alabama Tourism (offsite)
    •  A/O Tourism Bureau (offsite)
    •  Auburn Statistics
    •  Auburn University (offsite)
    •  Community Profile (PDF)
    •  Local Events (offsite)
    •  Local Hotels (offsite)
    •  Local Restaurants (offsite)
    •  Local Shops (offsite)
    •  Maps
    •  Southern Union
    •  Student Information
  • [Home2]
    •  Auburn Community Profile (PDF)
    •  Auburn Training Connection
    •  Bids & Requests for Proposals
    •  Board of Zoning Adjustment
    •  Business and Licensing Forms
    •  City Code
    •  City Council
    •  Economic Development
    •  License Ordinance
    •  Planning Commission
    •  Planning Department
    •  Press Releases
    •  Standard Specs and Details
    •  Tax Information
    •  Zoning Ordinance
  • [Home2]
    •  Budget Materials
    •  e-Notifier
    •  Local Media
    •  Meeting Packets
    •  Open Line
    •  Press Releases
    •  Publications
City of Auburn Home
  • [Button]
  • [Button]
    •  Administration (PDF)
    •  Construction & Maintenance (PDF)
    •  Engineering Design (PDF)
    •  Inspection (PDF)
    •  Traffic Engineering (PDF)
    •  See All City Budget Materials
  • [Button]
    •  Weekly Status Report
  • [Button]
  • [Button]
    •  Administration
    •  Construction and Maintenance
    •  Engineering
    •  Inspections
    •  Traffic Engineering
  • [Button]
    •  Construction and Maintenance Goals FY09
    •  Construction and Maintenance Goals FY10
    •  Engineering Design Goals FY09
    •  Engineering Design Goals FY10
    •  Inspection Goals FY09
    •  Inspection Goals FY10
    •  Traffic Engineering Goals FY09
    •  Traffic Engineering Goals FY10
  • [Button]
  • [Button]
  • [Button]
  • [Button]
  • [Button]
  • [Button]
    •  Stormwater Manual (PDF)
    •  Specifications & Details
    •  Traffic Study
× Close
FY 08 Goals

Construction and Maintenance Division

  1. Design sidewalk on Longleaf Drive from Donahue Drive to South College by September 30, 2008.
  2. Design sidewalk on Gay Street from Halal Court to Shelton Mill Road by September 30, 2008.
  3. Design sidewalk on Gatewood Drive from Academy Drive to end by September 30, 2008.
  4. Continue to rebuild/repair an estimated 750 feet of broken sidewalk by September 30, 2008.
  5. Improve storm sewer infrastructure, including ditch maintenance and piping projects, by completing at least two miles of stream maintenance by September 30, 2008.
  6. Perform crack-sealing on 10 miles of streets by September 30, 2008.
  7. Complete FY 08 Streets Resurfacing Project by September 30, 2008.
Traffic Engineering Division

  1. Design a multiuse path on South Donahue Drive from South College Street to East University Drive by September 2008.
  2. Design intersection improvements to enhance traffic flow and reduce accidents at Donahue Drive and West Magnolia Avenue by July 2008.
  3. Design intersection improvements to enhance traffic flow and reduce accidents at South College Street and East University Drive/Shug Jordan Drive by July 2008.
  4. Design intersection improvements to enhance traffic flow and reduce accidents at East University Drive and Shelton Mill Road by September 2008.
  5. Install traffic signals at East Samford Avenue and East Glenn Avenue when Samford Avenue is extended by September 2008.
  6. Install traffic signals at East Samford Avenue and East University Drive when Samford Avenue is extended by September 2008.
  7. Perform signal warrant analysis for a traffic signal at Willow Creek Road and Hwy 14 by September 2008.
  8. Perform signal warrant analysis for a traffic signal at Opelika Road and Saugahatchee Road upon substantial completion of subdivision by September 2008.
  9. Improve access to critical data by continuously updating traffic counts in GIS to within 5 years by September 2008.
  10. Complete ALDOT/FHWA required Bridge Inspections by June 2008.
  11. Complete analysis of Intelligent Transportation Systems applications for City of Auburn by September 2008.
Engineering Division

  1. Design and construct the Samford Avenue Extension from East University Drive to Glenn Avenue by September 2008.
  2. Design replacement of Wire Road Bridge by August 2008.
  3. Design the East Glenn Avenue Median Project by September 2008.
  4. Design project to widen Bragg Avenue to three lanes by September 2008.
  5. Design project to improve drainage on Opelika Road near Guthries by August 2008.
  6. Design sidewalk on West Glenn Avenue from Byrd Street to Donahue Drive by September 2008 (CDBG).
  7. Complete annual update of Engineering Standard Operating Procedures by June 2008.
Inspections Division

  1. Conduct annual detention pond inspections by September 2008.
  2. Have all the inspectors certified/recertified as Grade I Water Treatment Operator and Roadway Technician by September 2008.
  3. Complete FY 08 Streets Re-striping Project by September 2008.
  4. Oversee construction of the addition to the Library by September 2008.
  5. Oversee construction of the Samford Avenue Extension project by September 2008.
Administrative Division Goals

  1. Complete wetlands bank study by September 2008.
  2. Complete development of a comprehensive Engineering Manual that consolidates all current design standards and specifications and incorporates new specifications into one easy to use source for use by the Engineering staff as well as the development community by September 2008.
FY 07 Goals
For more information, please contact us at webpw@auburnalabama.org